Illustration: Representative example, not a completed ABI project
BridgesEast Kalimantan · 2024
River Crossing Cable-Stayed Bridge
- Main span
- ±240 m
- Pylon height
- ±95 m
- Stay cables
- 2 × 16
§Commercial
Illustrative project: 48 three-storey shophouses with an estate road and integrated utilities, fully BIM-coordinated from design through to handover.
Illustration: Representative example, not a completed ABI projectThe owner needed 48 shophouse units that could be marketed in phases, while the estate road and drainage had to operate from the day the first block was handed over.
The first block was handed over early for marketing, and quantity schedules taken from the model gave the owner a transparent basis for evaluating variations.
BridgesEast Kalimantan · 2024
Toll roadsCentral Java · 2024
→Next step
Send us the location, scope and timeline. A senior engineer replies within two working days.
Email our engineerscontact@syairozi.com