Illustration: Representative example, not a completed ABI project
CommercialWest Java · 2025
Eastern Corridor Shophouse District
- Shophouse units
- 48
- Gross floor area
- ±21,000 m²
- Duration
- 14 months
§Toll roads
Illustrative project: a four-lane concrete toll road section with interchanges and drone surveys to control progress and cut-and-fill volumes.
Illustration: Representative example, not a completed ABI projectThe section crossed rice fields with variable subgrade and had to connect to an existing national road that stayed open to traffic.
Site progress could be compared directly with the plan every week, and disruption to the existing road was kept to a minimum.