Rigid Pavement Toll Road Section

Illustrative project: a four-lane concrete toll road section with interchanges and drone surveys to control progress and cut-and-fill volumes.

Illustration: Representative example, not a completed ABI project

Challenge

The section crossed rice fields with variable subgrade and had to connect to an existing national road that stayed open to traffic.

Approach

  • Rigid pavement for heavy-vehicle traffic, with surface and subsurface drainage designed from the start.
  • Regular drone surveys to track progress and calculate cut-and-fill volumes.
  • Phased traffic management at the interchanges, rehearsed in a 4D model.

Outcome

Site progress could be compared directly with the plan every week, and disruption to the existing road was kept to a minimum.

More projects

  • Illustration: Representative example, not a completed ABI project

    CommercialWest Java · 2025

    Eastern Corridor Shophouse District

    Shophouse units
    48
    Gross floor area
    ±21,000 m²
    Duration
    14 months
  • Illustration: Representative example, not a completed ABI project

    BridgesEast Kalimantan · 2024

    River Crossing Cable-Stayed Bridge

    Main span
    ±240 m
    Pylon height
    ±95 m
    Stay cables
    2 × 16