Illustration: Representative example, not a completed ABI project
CommercialWest Java · 2025
Eastern Corridor Shophouse District
- Shophouse units
- 48
- Gross floor area
- ±21,000 m²
- Duration
- 14 months
§Bridges
Illustrative project: a single-pylon cable-stayed bridge over a wide river, built by cantilever with sensor-based cable monitoring from day one.
Illustration: Representative example, not a completed ABI projectA wide river with an active navigation channel ruled out piers in the channel, and the riverbanks sat on deep soft ground.
The navigation channel stayed open throughout construction, and the owner received a complete asset model with sensor data for condition-based inspection.
CommercialWest Java · 2025
Toll roadsCentral Java · 2024
→Next step
Send us the location, scope and timeline. A senior engineer replies within two working days.
Email our engineerscontact@syairozi.com