River Crossing Cable-Stayed Bridge

Illustrative project: a single-pylon cable-stayed bridge over a wide river, built by cantilever with sensor-based cable monitoring from day one.

Illustration: Representative example, not a completed ABI project

Challenge

A wide river with an active navigation channel ruled out piers in the channel, and the riverbanks sat on deep soft ground.

Approach

  • An options study of girder, arch and cable-stayed solutions with a life-cycle cost comparison.
  • Deck construction by cantilever from the pylon, with no falsework in the river.
  • Simulation of the cable stressing sequence, and sensors on cables and bearings as the basis of a digital twin.

Outcome

The navigation channel stayed open throughout construction, and the owner received a complete asset model with sensor data for condition-based inspection.

More projects

  • Illustration: Representative example, not a completed ABI project

    CommercialWest Java · 2025

    Eastern Corridor Shophouse District

    Shophouse units
    48
    Gross floor area
    ±21,000 m²
    Duration
    14 months
  • Illustration: Representative example, not a completed ABI project

    Toll roadsCentral Java · 2024

    Rigid Pavement Toll Road Section

    Section length
    ±18 km
    Lanes
    2 × 2
    Interchanges
    2