CommercialWest Java · 2025
Eastern Corridor Shophouse District
- Shophouse units
- 48
- Gross floor area
- ±21,000 m²
- Duration
- 14 months
§Roads
Illustrative project: widening and structural upgrade of a regency road, including drainage repairs and small bridge replacements, while keeping access open.
Illustration: Representative example, not a completed ABI projectA regency road serving residents and plantation traffic kept failing because of standing water and truck loads.
A wider, stronger road with working drainage, and uninterrupted access for residents during the works.
CommercialWest Java · 2025
BridgesEast Kalimantan · 2024
→Next step
Send us the location, scope and timeline. A senior engineer replies within two working days.